Glossary
| Term | Meaning |
|---|---|
| XER | Primavera P6 exchange file |
| Baseline | Original plan schedule in the session |
| Update | Progress / forecast schedule |
| Data date | last_recalc_date — as-of date of the schedule |
| Float | Total float from P6 (total_float_hr_cnt), often shown in workdays |
| Critical | Incomplete activity with float ≤ 0 |
| Near-critical | Open work with float within a dynamic remaining-duration threshold (AACE-style) |
| DCMA 14-point | Schedule quality assessment implemented by Health Checker |
| Target Trap | Mistakenly using target_end_date for update wave tracking |
| LOE | Level of Effort (TT_LOE) — excluded from float averages |