Skip to content

Scheduling Kernel Master Plan ​

Delivered 2026-08-17..2026-08-18 (K-Gate 0 + K0–K5 SHIPPED); K6 Scenario engine 2026-08-21; K8 count-based BEI 2026-08-21. Full internal roadmap: repository docs/SCHEDULING_KERNEL_MASTER_PLAN.md (governing ADR 0138). Reconciled 2026-08-21.

Scope ​

Calendars, CSR graph, columnar spine, evaluation/reconciliation, authority ledger, analysis plugin surface, gated what-if scenarios, and count-based DCMA BEI.

Kernel phases (shipped) ​

PhaseADRFocus
K-Gate 00138Authority model (observed / derived / degraded)
K00139Calendar-aware day values
K10140Schedule graph + observed path metrics (CPLI / driving trace)
K20141Schedule cube / columnar spine (flag-gated)
K30142Evaluation core + reconciliation
K40143Authority ledger
K50144Analysis API + plugin host
K60147Scenario / what-if engine (gated on integrity)
K80148Count-based DCMA BEI (closes G14)

Residuals (2026-08-19..21) ​

ItemStatusNotes
G12 calendar-aware comparison display/exportDone 2026-08-19Closes residual 8h divisor on non-8h calendars
G13 critical activity vs driving pathDone 2026-08-19Vocabulary + driving paths; superseded UI by Critical Path & Float Risk (ADR 0289)
G14 count-based DCMA BEIDone 2026-08-21ADR 0148 supersedes ADR 0140 BEI formula; K8 shipped
K2.5 portfolio re-baselineDone 2026-08-20Flag-off smoke PASS (peak 262 MB); Attempt C FAIL retained as history
K7 cube path activationDone (env-gated) 2026-08-20ADR 0146; flag-on smoke PASS (peak 311 MB); default unset/false
K6 scenario / what-if engineDone 2026-08-21ADR 0147; Scenarios tab; locked until Schedule Integrity passes

See master plan section 14 for the living conformance snapshot (Phase / Status / Notes).

Privacy-first Primavera P6 schedule analytics.